Case Studies — Real C&I and Solar Projects
Anonymized ROI analyses with real HUPX market prices, modeled on actual load profiles — from high-consumption industry to mid-size C&I sites. CAPEX, payback, IRR and scenario comparison.
High-consumption industrial facility, 5 MW peak load
Continuous-load 24/7 industrial site with 5 MW peak demand. We modeled three scenarios against actual HUPX market prices: PV only, BESS only, combined PV+BESS. The combined scenario showed the strongest 15-year economics.
- Load profile: 5 MW peak · 24/7 industrial
- BESS: 6,3 MWh (5,6 MWh @ 90% DoD)
- PV: +3,75 MWp (new installation)
- CAPEX: ~4,5M EUR
Low-load C&I site on HUPX market pricing
Small C&I site on HUPX-based market pricing, with an existing 50 kWp PV array and 100 kW MV grid. Adding a 261 kWh / 125 kW BESS for peak shave and grid-export arbitrage. Best scenario combines self-consumption with export during high-price hours.
- Grid connection: 100 kW MV
- BESS: 261 kWh (235 kWh @ 90% DoD) · 125 kW PCS
- PV: 50 kWp (existing)
- CAPEX: ~65k EUR
- Round-trip efficiency: 92% · ≥6000 cycles
Modeled with HUPX average ~108.5 EUR/MWh and a fixed grid tariff equivalent of ~184 EUR/MWh.
Industrial production site, dedicated transformer station
Mid-load industrial site with a dedicated transformer station. Adding a 522 kWh BESS and a 200 kWp PV array to cut peak demand charges and network fees. Mid-term payback, robust economics.
- BESS: 522 kWh (Spower II) · 470 kW
- PV: +200 kWp (new installation)
- CAPEX: ~155k EUR
- cos φ: 0,995 (daily average)
PV + BESS + EV fast-charging station
Standalone EV charging station with only 150 kW grid connection — we deliver 400 kW dynamic charging beyond the grid limit. 522 kWh Welion BESS buffers PV and grid, enabling multiple Teslas to supercharge simultaneously — without a costly DSO upgrade application.
- BESS: 522 kWh (2× 261 kWh Spower I) · 250 kW
- PV: 50 kWp · 50 kW inverter
- Grid connection: 150 kW
- Chargers: 4× with dynamic allocation
Want a similar analysis for your site?
Send us your load profile, grid connection size and rough budget — we deliver an HUPX-based ROI model with DSO-compliant design within 48 hours.
Request a Site AssessmentNote: all case studies are anonymized. Actual customer names are only shared with explicit consent during the sales process.